MBH has equipped the Naameh landfill 7MW Power Plant with 7 containerized generating sets, each powered by GE Jenbacher J320 GS genset type of 1MW capacity each. The total output power is being exported to the Lebanese grid for a period of 15 years. The power plant which was constructed by a local contractor, is…
Read more
About: admin
Recent Posts by admin
‘Team Leader Genset Assembly (mech.)’ Vacancy
Responsible for the assembling of components made into finished goods incl. testing. The role of team leader includes some people management and reporting requirements. ls using such processes as welding; sewing; pressing; machining and painting, puts together various goods and parts to assemble Generating Sets ready for testing in cooperation with electrical team leader. The…
Read more
‘Welder/piping for Genset Assembly’ Vacancy
The job of a pipe welder entails various functions. In the assembly of Generating sets different type of piping activities are required for different media. There are different systems that need to be connected to the main engine; cooling water, fuel (diesel or gas), lub.oil and pressurized air. The installation must be absolutely leak free…
Read more
Farewell of longtime employee Wilfried Rieche
In September 1966, Mr. Wilfried Rieche started his career as an apprentice at MBH. Now, after dedicating himself to our company for over 48 years, he decided to leave to enjoy his retirement. We want to thank him for all these years of hard work and wish him all the best.
Read more
Recent Comments by admin
No comments by admin yet.
Comments